Language Selection

Who's Online

We have 1 member online
  • Zzttheeb6m

Featured Products

Purchase 40 WMS for Rm1888.00 Only with FREE Checklist
Purchase 40 WMS for Rm1888.00 Only with FREE Checklist
RM1,888.00
Add to Cart

Purchase All OSHMS Procedure with Forms Rm650.00 Only
Purchase All OSHMS Procedure with Forms Rm650.00 Only
RM650.00
Add to Cart

Home arrow Order arrow QUALITY arrow Construction Methodology arrow Construction Methodology For Retaining Wall
Info: Your browser does not accept cookies. If you want to put products into your cart and purchase them you need to enable cookies.

PDF
QUALITY arrow Construction Methodology arrow Construction Methodology For Retaining Wall

Construction Methodology For Retaining Wall

Construction Methodology For Retaining Wall


Price per Unit (piece): RM125.00


REGISTERED MEMBER; GET 25% to 30% DISCOUNT!!!

1.0               Objective                                                              

2.0               Scope of Work                                                      

3.0               References                                                           

4.0               Resources Planning                                             

4.1                   Material Planning

4.2                   Manpower Planning

4.3                   Machinery & Equipment Planning

5.0               Material Handling & Delivery Inspection              

5.1                   Material Handling

5.2                   Material Delivery Inspection: Checking Methodology      

6.0               Coordination between Other Trades                   

6.1                   Coordination between Others Architecture Trades

6.2                   Coordination between Others C&S Trades

6.3                   Coordination between Others M&E Trades         

7.0               Work Methodology                                              

7.1                   Design Mix Submission & Plant Trial Mixes Requirements

7.2                   Preparation to Start Work: Bar Bending and Carpentry Works

7.3                   Survey Setting Out (Wall Position, Level & Alignment)

7.4                   Base Preparation (Excavation, Foundation, Compaction & Lean Concrete)

7.5                   Base: Fixing Reinforcement Bar and BRC

7.6                   Base: Fixing Formwork, Support and Accessories

7.7                   Base: Placement of the Concrete

7.8                   Wall: Fixing Reinforcement Bar and BRC

7.9                   Wall: Fixing Formwork, Support and Accessories

7.10                Wall: Placement of the Concrete

7.11                Application of Curing Compound and Striking Formwork

7.12                Retaining Wall: Backfilling and Compaction

8.0               Quality: Inspection and Test Plan                        

8.1                   Inspection Test Plan

8.2                   Relevant Construction Standard & References

8.3                   QC Documents or Relevant Checklist                                                   

9.0                Health, Safety, Security and Environment           

10.0          Attachment                                                             

TOTAL PAGES = 10 PAGES

 




 


Customer Reviews:

There are yet no reviews for this product.
Please log in to write a review.





Google